1 stranded capacity
резерв мощности на покрытие несбалансированности нагрузок разного вида
-
[Интент]Stranded capacity
Stranded capacity is capacity that cannot be utilized by IT loads due to the design or configuration of the system. The presence of stranded capacity indicates an imbalance between two or more of the following capacities:A specific IT device requires sufficient capacity of all of the five above elements. Yet these elements are almost never available in an exact balance of capacity to match a specific IT load. Invariably, there are locations with rack space but without available cooling, or spaces with available power but with no available rack space. Capacity of one type that cannot be used because one of the other four capacities listed above has been used to its maximum capacity is called stranded capacity. Stranded capacity is undesirable and can seriously limit the performance of a data center. Unfortunately, most data centers have significant stranded capacity issues, including the following common examples:
- An air conditioner has sufficient capacity but inadequate air distribution to the IT load
- A PDU has sufficient capacity but no available breaker positions
- Floor space is available but there is no remaining power
- Air conditioners are in the wrong location
- Some PDUs are overloaded while others are lightly loaded
- Some areas are overheated while others are cold
Depending on the situation and the architecture of the power and cooling system, it might be impossible to utilize stranded capacity or it might be that only minor investments are needed to free stranded capacity so that it can be effectively used. By definition, utilizing stranded capacity comes at a cost. It is often necessary to take down part of the installation or install new power and cooling components.
Stranded capacity is a very frustrating capacity management problem for data center operators because it is very hard to explain to users or management that a data center with 1 MW of installed power and cooling capacity can’t cool the new blade servers when it is only operating at 200 kW of total load.
An effective capacity management system not only identifies and highlights stranded capacity, but also helps customers avoid creating it in the first place.
[APC]Тематики
EN
Англо-русский словарь нормативно-технической терминологии > stranded capacity
См. также в других словарях:
резерв мощности на покрытие несбалансированности нагрузок разного вида — [Интент] Stranded capacity Stranded capacity is capacity that cannot be utilized by IT loads due to the design or configuration of the system. The presence of stranded capacity indicates an imbalance between two or more of the following… … Справочник технического переводчика
India — /in dee euh/, n. 1. Hindi, Bharat. a republic in S Asia: a union comprising 25 states and 7 union territories; formerly a British colony; gained independence Aug. 15, 1947; became a republic within the Commonwealth of Nations Jan. 26, 1950.… … Universalium
Northeast Blackout of 2003 — The Northeast Blackout of 2003 was a massive widespread power outage that occurred throughout parts of the Northeastern and Midwestern United States, and Ontario, Canada on Thursday, August 14, 2003, at approximately 4:15 pm EDT (20:15 UTC), with … Wikipedia
List of Bobobo-bo Bo-bobo characters — The universe of the anime and manga series Bobobo bo Bo bobo is a home to a wide array of fictional characters. Contents 1 Main characters 1.1 Bobobo bo Bo bobo 1.2 Beauty 1.3 … Wikipedia
List of Teenage Mutant Ninja Turtles (1987) episodes — The following is an episode list for the animated television series Teenage Mutant Ninja Turtles which premiered in 1987. In total 193 episodes aired between 1987 and 1996. The first three seasons were aired in syndication. CBS aired the rest of… … Wikipedia
Recreational vehicle — This article is about the vehicle. For the film, see RV (film). RV redirects here. For other uses, see RV (disambiguation). A Class A motorhome with slide out extended floors … Wikipedia
April Fools Day 2008 — April 1, 2008 was an April Fools Day falling on a Tuesday. In newspapers, magazines and news websites * About.com s Car Reviews posted a fake story that Toyota had announced a new 256 horsepower V6 Prius to accommodate the needs of car buyers… … Wikipedia
Samsung Electronics — 삼성전자 Type Public Korean: 삼성전자 Traded as KRX: 005930 … Wikipedia
Honour and Passion — Infobox Television show name = Honour And Passion zh. 宝家卫国 caption = genre = Contemporary Drama format = runtime = approx. 46 minutes creator = director = producer = writer = starring = Tay Ping Hui Bryan Wong Lu Jiang Felicia Chin Rui En Pierre… … Wikipedia
Vietnam — /vee et nahm , nam , vyet , vee it /, n. 1. Official name, Socialist Republic of Vietnam. a country in SE Asia, comprising the former states of Annam, Tonkin, and Cochin China: formerly part of French Indochina; divided into North Vietnam and… … Universalium